TABLE OF CONTENTS
Introduction
Environmental Monitoring and Audit
Progress
Breaches of Action and Limit Levels
Reporting Changes
Future Key Issues
Purpose of the report
Structure of the report
Background
Project Organization
Summary of Construction Works
Undertaken During Reporting Month
Construction Programme
Status of Environmental Licences, Notifications and Permits
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency
and Duration
Monitoring Methodology and QA/QC
Procedure
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency
and Duration
Monitoring Methodology and QA/QC
Procedures
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Parameters, Frequency
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
QA/QC Requirements
Results and Observations
Event and Action Plan
6. LAND CONTAMINATION
(AMBIENT ARSENIC MONITORING)
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency
and Duration
Monitoring Methodology and QA/QC
Procedure
Maintenance/Calibration
Laboratory Measurement / Analysis
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Location
Monitoring Parameters and Frequency
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring of Measures to Minimise Disturbance to Water Birds in Ng Tung River,
Sheung Yue River, Shek Sheung River and Long Valley
Monitoring of Measures to Minimise Impacts to Ma Tso Lung Stream and Siu Hang San
Tsuen Stream, and Long Valley
Monitoring of Measures to Minimise Impacts on Ecological Sensitive Habitats from
Disturbance and Pollution
Results and Observation
References
10 ENVIRONMENTAL SITE INSPECTION
Site Audits
Implementation Status of
Environmental Mitigation Measures
Implementation Status of Water
Quality Mitigation Measures
Solid and Liquid Waste Management
Status
Ecological Mitigation Measures –
Creation of Long Valley Nature Park (LVNP)
11 ENVIRONMENTAL NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental
Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and
Successful Prosecution
Key Issues in the Coming Three
Months
Monitoring Schedule for the Next
Month
Construction Programme
for the Next Month
13 CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Works
Contracts under relevant Environmental Permit(s) in the Reporting Month
Table II Summary
Table for EM&A Activities in the Reporting Month
Table III Summary
Table for Events Recorded in the Reporting Month
Table
IV Summary Table for Site Activities in the
coming Three Months
Table
2.1a Summary
of EPs under the Project and the Respective Work Contracts
Table
2.1b Summary
of Scope of Works under Concerned EP
Table 2.2 Key
Contacts of the Project
Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Table 2.4 Status
of Environmental Licences, Notifications and Permits
Table 3.1 Location
for Air Quality Monitoring Locations
Table 3.2
Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Month
Table 3.5 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Month
Table 3.6 Observation
at Dust Monitoring Stations
Table 4.1 Location
for Noise Monitoring Stations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Duration and Frequency
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Month
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Water
Quality Monitoring Parameters and Frequency
Table 5.2 Additional
Water Quality Monitoring Stations
Table 5.3 Water
Quality Monitoring Equipment
Table 5.4 Additional
Water Quality Monitoring Parameters and Frequency
Table 5.5 Method
for Laboratory Analysis for Water Samples
Table 5.6 Summary
of Water Quality Exceedances
Table 6.1 Location
of Ambient Arsenic Monitoring station
Table 6.2
Ambient
Arsenic Monitoring Equipment
Table 6.3
Impact
Ambient Arsenic Monitoring Parameters, Frequency and Duration
Table 6.4 Summary
Table of 24-hour RSP Monitoring Results during the Reporting Month
Table 7.1
Landfill
Gas Monitoring Equipment
Table 8.1 Location
of Construction Vibration Monitoring
Table 8.2 Vibration
Monitoring Plan
Table 8.3 Vibration
Limits for Construction Vibration Monitoring
Table 9.1 Summary
Table of Avifauna Monitoring Results to Corresponding Action and Limit Levels
Table 9.3 Summary
Table of Fish Monitoring Results to Corresponding Action and Limit Levels
Table 9.4 Summary
Table of Mammal Monitoring Results to Corresponding Action and Limit Levels
Table 9.5 Summary
Table of Herpetofauna Monitoring Results to Corresponding Action and Limit
Levels
Table 9.6 Summary
Table of Butterfly Monitoring Results to Corresponding Action and Limit Levels
Table 9.7 Summary
Table of Odonata Monitoring Results to Corresponding Action and Limit Levels
Table
10.1 Summary
of Site Audit
Table
10.2 Observations
and Recommendations of Site Audit
Table
10.3 Summary
Table for the Outstanding item(s) in the reporting month
Table
10.4 Photographic
Records and Implementation Status of Measures
Table
10.6 Photographic
Records of Site Activities in LVNP
LIST OF DRAWINGS
LIST OF FIGURES
Figure 1 Location
of Air Quality Monitoring Station (KTN)
Figure 2 Location
of Air Quality Monitoring Station (FLN)
Figure 3 Location
of Noise Monitoring Station (KTN)
Figure 4 Location
of Noise Monitoring Station (FLN)
Figure 5 Location
of Additional Water Quality Monitoring Stations at River Beas
Figure 7 Location
of Ambient Arsenic Monitoring Station
Figure 8 Location
of Landfill Gas monitoring
Figure 10 Location
of Monitoring Stations at Ma Tso Lung Stream and Siu Hang Sun Tsuen Stream
Figure 12 Site
Layout Plan of Contract ND/2019/01 under EP-466/2013/A
Figure 13 Site
Layout Plan of Contract ND/2019/01 under EP-467/2013/A
Figure 14 Site
Layout Plan of Contract ND/2019/01 under EP/468-2013/A
Figure 15 Site
Layout Plan of Contract ND/2019/03 under EP-468/2013/A
Figure 16 Site
Layout Plan of Contract ND/2019/02 under EP-469/2013
Figure 17 Site
Layout Plan of Contract ND/2019/01 under EP-470/2013/A
Figure 18 Site
Layout Plan of Contract ND/2019/03 under EP-473/2013/A
Figure 19 Site
Layout Plan of Contract ND/2019/04 under EP-473/2013/A
Figure 20 Site
Layout Plan of Contract ND/2019/05 under EP-473/2013/A
Figure 21 Site
Layout Plan of Contract ND/2019/06 under EP-475/2013/A
Figure 22 Site
Layout Plan of Contract ND/2019/04 under EP-546-2017
LIST OF APPENDICES
Appendix A Construction Programme
Appendix B Action and Limit Levels
Appendix C Copies of Calibration
Certificates
Appendix D Environmental Monitoring
Schedules
Appendix E Air Quality and Ambient
Arsenic Monitoring Results and Graphical Presentation
Appendix F Noise Monitoring
Results and Graphical Presentation
Appendix G Water Quality Monitoring
Results and Graphical Presentations
Appendix H Laboratory Testing Reports
for Laboratory Analysis
Appendix I Quality Control
Reports for SS and Arsenic Laboratory Analysis
Appendix J Landfill Gas Monitoring
Results
Appendix K Built Heritage Monitoring
Results
Appendix L Ecological Monitoring
Results
Appendix O Summary of Exceedance
Appendix Q Environmental Mitigation
Implementation Schedule (EMIS)
Appendix R Waste Generation in the
Reporting Month
Appendix T Summary of Successful
Prosecution
Appendix U Summary Table for Required
Submission under Environmental Permits